Skip to content
Back

AI skill, open source · 2026

Design Skill

A full design team inside your AI. A skill built on the open Agent Skills standard that reads your request, identifies the stage of the design process and calls the right specialist: strategy, research or visual execution.

Install in Claude Code
git clone https://github.com/guilhermedworakowski/design-skill.git

01 · Why it exists

Asking for "a screen" is not a design process.

AI answers fast, but it skips steps. It designs before understanding the problem, picks one path without showing alternatives and applies the same framework to every situation.

In practice, design means choosing the right method for each moment: research before deciding, decide before designing, and justify every choice.

I built Design Skill so AI works this way. It does not replace the designer: it organizes the process and shows the reasoning behind every deliverable.

02 · How it works

One orchestrator, three specialists.

You write as usual. The orchestrator analyzes the request, checks the cognitive biases that affect it and calls the right agent. When the project is complete, the three work in a chain.

All three draw on the same base: 18 cognitive biases, 22 frameworks, 10 Nielsen heuristics and 15 execution patterns.

  • Strategist: product strategy, OKRs, MVPs, personas, flows and business rules.
  • Researcher: research plans, interviews, benchmarking, A/B tests and insight synthesis.
  • Designer Engineer: wireframes, high fidelity, prototypes, heuristic evaluation, handoff and code.

03 · In practice

You write. The skill picks who answers.

A request with real context (data, deadline, team, constraints) gets an answer to match. One example for each agent:

Researcher
We run a subscription course app. Monthly churn went from 4% to 7% over the last two quarters and nobody can say why. We have usage data in Amplitude and contacts for everyone who cancelled in the last 60 days. Build a research plan to find the reasons in 4 weeks: methodology, recruiting, interview script and how we'll synthesize the findings for the leadership team.
Strategist
Our furniture e-commerce loses 68% of people at checkout. The biggest drop is at the shipping step, when the delivery time shows up (25 days on average). Sales wants to offer a discount coupon, the product team wants to rebuild the whole checkout. We have one quarter and two devs. What paths do we have, what goes into the MVP and how will we measure whether it worked?
Designer Engineer
Design the appointment booking screen of our clinic's app in high fidelity. Much of our audience is over 60, and many people give up when choosing a date and time. Follow the patterns in patterns.md, include the loading, no available slots and error states, and deliver it ready for handoff.

04 · Decisions

What I chose, and why.

  • An orchestrator instead of one giant skill

    Each agent has its own persona, frameworks and deliverable format.

    Why: focused instructions produce better answers than one manual with everything.

  • Cognitive biases before any answer

    The skill identifies which biases affect the request before proposing anything, and checks ethics and dark patterns before delivering.

    Why: understanding user behavior comes before the screen.

  • Always at least two paths

    When there is more than one way forward, the skill shows the options and justifies the chosen framework.

    Why: the designer decides, not the AI.

  • One question at most

    If the request is ambiguous, the skill asks one question and moves on.

    Why: helping without turning into an interrogation.

  • The brand as the source of truth

    With patterns.md filled in (colors, typography, tone of voice and business rules), every deliverable carries the brand.

    Why: without it, everything comes out generic and needs adapting later.

  • Portuguese and English, same content

    Two versions with the same agents and references, triggered by the language of the conversation.

    Why: it meets the team where it works.

05 · Result

What comes back from a request.

The skill's answer to the furniture checkout request, summarized. The format is always the same: who was called, the reasoning, the pain points, the paths and how to measure.

Request · Strategist
Our furniture e-commerce loses 68% of people at checkout. The biggest drop is at the shipping step, when the delivery time shows up (25 days on average). Sales wants to offer a discount coupon, the product team wants to rebuild the whole checkout. We have one quarter and two devs. What paths do we have, what goes into the MVP and how will we measure whether it worked?
  1. Agent and biases

    Strategist, because the request is about prioritization and an MVP. Active biases: loss aversion (the delivery time feels like a loss after the person has already chosen the furniture) and the sunk cost effect (whoever reaches shipping has already invested time and tends to continue, unless surprised).

  2. The problem, as pain points

    The delivery time shows up too late, when the purchase felt decided. There is no way to choose between faster delivery and a lower price. And the time comes with no explanation: 25 days reads as neglect, not as furniture made to order.

  3. Framework: Opportunity Solution Tree

    Chosen because two solutions are competing for the same problem (coupon and new checkout). The tree starts from the outcome, drop-off at shipping, and links each pain point to an opportunity before discussing solutions.

  4. Path A: show the delivery time earlier

    Estimated delivery on the product page and in the cart, based on the zip code, with the reason ("made to order"). Fits in 2 sprints and tackles the surprise, the likely cause.

  5. Path B: delivery options

    Express delivery for in-stock items and in-store pickup. Tackles the lack of choice, but depends on logistics and does not fit fully in the quarter.

  6. MVP and how to measure

    Recommendation: path A in the MVP; the coupon stays out, because a discount does not change the delivery time and trains customers to wait for sales. Primary metric: drop-off at the shipping step, in a 4-week A/B test. Supporting metrics: overall conversion and support contacts about delivery time.

Next project: Pomodochi